I refer to your letter in response to council's building notice requesting the building
works to be allowed to remain and wish to confirm the procedure to be followed to
finalise this matter.
In order to resolve this matter pls provide within 30 days the following:
1.You will need to complete an application for council consideration.
2.Provide 3 copies of plans, indicating the following:
Location of the building works in relation to the existing buildings and allotment
boundaries.(Site Plan)
Fully detailed "as built" floor plans and elevations
Sections showing the details of the footing,floor construction, natural ground level ,
framework as constructed,wall claddig and materials used.
Method of damp proofing the existing concrete floor slab.
3.Provide a copy of the title.
4.A minimum fee of $1510.00 applies to this application.
upon receipt of all necessary information and details as outlined above,assessment of
your application will be completed and you will be advised of any remedical work that may
be required.
If satisfactory,you will be issued with a statement,indicating that the building has
been"Built without a permit,allowed to remain."
Pls note that it is not the intent of the building Act or the building Regulations that
Building permits be issued retrospectively.therefor Council will not grant a formal
building permit as the building works has been constructed prior to your application
being considered by Council. |